Dale checked the forecast. Rain was coming, though not yet alarming. He told himself the soil might hold if the first showers remained gentle and the seed had time to establish. He told himself contractors dealt with these problems constantly. He told himself a bare channel was not the same as a failed channel.
Then the first November front arrived.
Rain fell for two days. Not a freak storm. No television weather anchors shouting about a once-in-a-century event. Just three inches over the county in a hard, ordinary autumn system, falling on soil that had been shaped, seeded, and left exposed before roots had a chance to bind it.
Dale went out after the first night and walked the upper terrace in rubber boots. The waterway was carrying flow, but the bare surface had already begun to surrender small particles. He saw thin channels forming where runoff gained speed. On the backslope, seed and loose soil moved together toward the low points.
He stood there in the rain, watching the water tell him how vulnerable the new work remained.
The next morning, the rills were deeper.
The contractor arrived early, took one look, and swore softly.
Dale did not need translation. He could see the problem. The terraces had been graded for water management, but the vegetation supposed to stabilize them existed mostly as seed in loose earth. Seed cannot hold a slope before it grows. Water does not wait for a lender's draw schedule or a contractor's promised roll shipment.
Dale walked the channel and pressed his boot beside a fresh cut. Muddy water continued to travel down the slope. The newly shaped soil was beginning to move in the exact direction the expensive project was meant to prevent.
“We need cover,” he said.
The contractor nodded. “Immediately.”
“How much?”
They reviewed the site sheets. For the waterway and terrace backslopes, the protected area came to roughly one hundred thousand square yards under the planned scope.
Dale stared at the number, as large and unsettling in its way as Marla's original bale count.
“One hundred thousand,” he repeated.
“That's the coverage requirement.”
Dale pulled out the small folded paper he kept in his shirt pocket and began writing figures while the rain soaked his jacket sleeve.
Regrading and reseeding if the slopes failed. Delayed loan draw. Lost use of the cropland for a growing season. Additional interest. The risk of more soil reaching Cottonwood Creek. He knew the estimates were contingent, but contingent damage was still damage he might soon pay to repair.
The total approached one hundred eighty thousand dollars.
He folded the paper slowly and looked at the water running muddy below them.
The contractor said, “I'll try the suppliers again.”
Dale looked toward the sky. Another front was in the forecast.
“Don't try,” he said. “Find it.”
The contractor nodded, though neither of them knew where to look.
By evening Dale had called three major suppliers. One representative repeated the eight-to-ten-week lead time. Another suggested partial delivery with no guaranteed balance. The third sounded almost apologetic when he explained that highway contracts had taken available stock.
Dale had begun to thank him and hang up when the man paused.