By the time the last week of September ended, she had no illusion that the approaching delivery would settle every uncertainty. It might sharpen some. It might create new ones. But it would not determine her right to operate the farm or her obligation to make truthful decisions.
Rick could control his truck.
He could not rewrite what she had already measured.
The next morning she called her original smokehouse supplier and asked whether his byproduct stream was still available for occasional collection. He said yes, but the volumes were smaller and less predictable than Rick's chain. She contacted another independent pit operator and was offered limited trial quantities. A third had an existing disposal contract that could not be changed immediately. None of those calls solved her problem.
Together they reminded her that the problem was not the absence of every alternative. It was the time required to build them.
Rick seemed to be counting on that time.
The next serious problem did not come from Rick. It came from Marlene's own ambition.
An industrial buyer asked whether she could provide a larger run of consistent output before the end of October. The request was not a guaranteed contract, but it was real enough to justify preparation. The buyer had reviewed her recent samples and considered them promising, provided the next delivery met the same specification and arrived with complete test documentation. The request represented a chance to move from occasional accepted lots toward a predictable purchasing schedule.
June saw the proposal and asked one question before saying anything else.
“Where's the material coming from?”
Marlene pointed to the calendar. “Rick's scheduled deliveries through the trial. The independent suppliers can fill some of the gaps.”
“Can fill or have agreed to fill?”
Marlene lowered her pen. “Can probably fill.”
June did not say I told you so. She turned the proposal face down and waited.
“I know,” Marlene said.
“Know what?”
“That I'm building a plan partly on supply I don't control.”
“That's different from having no plan. But you need to decide how much risk you're actually taking.”
They ran the numbers three ways: the full scheduled intake, a reduced delivery scenario, and a severe shortfall. Under the full schedule, Marlene could produce the requested trial lot, pay her operating costs, and preserve a modest margin. Under the reduced scenario, she could still satisfy a smaller version if the buyer agreed to adjust the volume. Under the severe shortfall, she would miss the buyer's requested window and absorb extra costs for equipment and labor she had reserved.
The worst scenario was ugly but not fatal if she kept her spending controlled.
It would become fatal if she borrowed aggressively to expand before the next stage was secure.
June tapped the table. “The risk isn't only that Rick cuts you off. It's that you start acting as though he can't.”
Marlene nodded. “Then I won't buy the second vessel yet.”
“Good.”
“I'll reserve additional processing time, not equipment.”
“Better.”
“And ask the buyer whether they'd accept a staged lot instead of everything at once.”
“Now you're planning.”
Marlene called the buyer and negotiated more flexible delivery dates. The purchasing manager said he preferred predictable performance to optimistic promises. He would consider staged acceptance if each lot met the agreed specification and the overall source information remained accurate.