HOA President Filled My Creek Without Permission — Then Their Entire Neighborhood Started Flooding

Chapter 2

Theme:
Font Size:
24px

No signature line for me. No place to object, just a date. I did the thing you're supposed to do.

On the 26th, I sent her a certified letter and I kept it short and I kept the lawyer words out of it because I wanted a jury of ordinary people to be able to read it someday. I wrote that the channel was on my deed land and I had not consented. I wrote that I held a state water right on it. And I wrote the last part in plain English, one sentence on its own line, because it was the part that actually frightened me.

If you fill that channel, the water from your subdivision has nowhere to go but back up into your subdivision. The green return receipt card came back on March 30. Her signature is on it in ballpoint, slanted hard to the right. I filed it in the drawer with the seed invoices and figured that was the end of it because who reads a warning like that and signs for it, then does the thing anyway?

At 4:40 on the morning of April 1, I heard air brakes out on Bell Hollow Road. I lay in bed listening to trucks stage up in the dark on a public road I had no right to close. And I kept coming back to the same two sentences that would not fit together, no matter how I turned them.

She had my letter in her hand. She had signed for it. So, either she didn't believe me or somebody had already told her the same thing and she'd found a way to live with the answer. The Stonebrier board met the next evening in the clubhouse, and I walked in with a manila folder and no lawyer.

I'd pulled my deed that morning, instrument number 1998-02214 recorded in Nettleton County with the legal description of parcel 22-064 running four paragraphs down the second page. I'd also pulled the recorded plat of Stonebrier Landing Estates. The plat is the map. The map is where a subdivision says in permanent ink exactly what belongs to it.

I laid both on the table in front of Karen and traced the boundary with my finger slowly so nobody could say I'd rushed them. "Your common area stops here," I said.

"The channel is 130 ft south of that line. It's not in your plat. It never was." Nobody said anything.

A woman near the end of the table leaned in to look. Ashcraft did not look. He stared at a legal pad with nothing on it. Then he cleared his throat and read the sentence he'd clearly been given.

"This is a matter the board has already addressed." "Addressed when?" "Prior to commencement." That was the whole answer.

That was the treasurer of a 196-home association telling a man they'd buried alive that his own deed was old business. Karen didn't need a legal pad. "Twenty years," she said.

"For 20 years, that ditch has carried this community's drainage. Twenty years of use beats one piece of paper. It's called prescriptive right. Look it up." She said it with the confidence of somebody who had in fact looked it up once on a phone and stopped reading at the part she liked.

But it landed in that room. I watched three people nod. It's a fearsome thing to be right in a room where being right isn't the currency. So, I went and got a professional.

On April 5, Ivor Blanchard brought his crew and restaked the whole run. 640 ft, pink ribbon every 50 feet. Boundary pins driven flush and capped. It took most of a day and cost me $3,200 I did not have loose.

I drove out at 5 that afternoon to look at it, and every stake was gone. They were piled at the edge of Bell Hollow Road like brush waiting for the county. The ribbon had been wound around the bundle. Somebody had taken the time to make it tidy.

I photographed the pile from four angles. Then I stood in the road with my hands on my head for a minute because the alternative was walking up that hill and doing something that would end with me in the back of a car. The next morning, a woman in a Highfield Community Management polo came to my gate and handed me an envelope and would not meet my eyes while she did it. Notice of trespass.

I was barred from the construction zone on parcel 22-064 for reasons of job site safety and liability. Entry would be reported to the sheriff. I read it twice standing there in my own driveway. They had filled my creek and now they were telling me I couldn't walk down to look at what was left of it.

"Do you know what this is?" I asked her. "I just deliver them," she said, and she got back in her car. The rest arrived by mail over the next 4 days the way a bruise comes up slow.

A fine $500 for interference with association personnel and contractors. A second fine running $150 a day for continued obstruction accruing from April 2, whether or not I ever set foot down there again. And a letter from the association's law firm advising me that public statements questioning the association's rights in ditch A could constitute slander of title and that they would seek fees. Fines on land they had no interest in for objecting to the destruction of my own water.

I called the county. That took two days to even find the right building. When I finally got a human being at code enforcement, he listened, typed for a while and told me what they were putting in the file.

"Civil dispute between private parties." "There's a state water right on that channel." "Then that's a state matter, sir. We're not going to referee a boundary fight." I sat in my truck in that parking lot for a long time.

40,000 seedlings were drinking that night off my storage tank and a pump running longer every day. And I had just been told by the government that this was a disagreement between neighbors. Then on April 7, my phone rang from a number I didn't know.

"Mr. Chadwick? Maud Kirkindall. I'm on the board."

An older voice. Careful. The sound of somebody in a room by herself with the door shut.

News in the same category

HOA President Filled My Creek Without Permission — Then Their Entire Neighborhood Started Flooding

8 Part