HOA President Filled My Creek Without Permission — Then Their Entire Neighborhood Started Flooding

Chapter 6

Theme:
Font Size:
24px

Signed by the president under penalty of perjury, certifying that all permitted outfalls were clear and unobstructed and functioning as designed. Filed on April 22, 20 days after nine dump trucks put 2,400 yards of rock in the only outfall she had. She hadn't just buried it. She had told the county it was fine in writing with her signature on it while her neighbors were still running shop vacs in their basement.

The county reached Garvin Ruddock before I did. Stag had pulled the grading permits and found there weren't any, and a contractor facing an unpermitted work violation in a watercourse will save himself in about 4 minutes flat. He handed over his file and Stag's office sent me a copy in the record supplement. The original work order was on association letterhead: fill and grade channel, station 0+00 to 6+40, per Vossberg.

And at the bottom in ballpoint in a hand that slanted hard to the right exactly like the signature on my green return receipt card. Take it to grade. Don't call the county. I'd been on this since April 2.

And that was the first night I thought it might actually turn. It turned the other way instead because Karen found out the file was open and Karen did not retreat. Karen never once retreated. That's the thing people misjudge about her.

On May 18, Ruddock's trucks came back. I heard them at 7:00 in the morning and drove down and stood at the fence, and I watched them raise the pad another 3 ft and armor the whole west face with riprap angular quarry stone the size of microwaves keyed in with a machine. The gully the April flood had cut was gone under it. Birdie Longacre came down and stood next to me at the fence in his yard shoes and neither of us said anything for a minute.

"They're saying it's for the trail," he said. "Structural safety, Birdie. Go look at your pond and then come back and tell me it's for the trail." The HOA's variance application went to the county the same day, hand-delivered, requesting emergency authorization to reclassify.

I read it that evening. The feature in question is an artificial farm ditch excavated by the Chadwick family for irrigation purposes and is not a natural watercourse. No permit is required for its alteration. If that variance got granted, the pad became legal permanently.

Everything I had, the agreement, the letter, the certification, the work order became a fight about a ditch that was never a creek. And to pay for it, she passed an emergency assessment. $1,200 per household due in 30 days to fund the association's legal defense. That was the first thing she did that her own neighborhood didn't forgive.

Birdie told me the comment thread ran 400 posts before somebody turned it off. 196 families had been flooded once blamed a neighbor for it and were now being billed $1,200 apiece to keep arguing about it. I spent 2 days building the rebuttal. Aerial photographs from the county archive, 1962 and 1988, both showing a dark sinuous line running the length of my bottomland.

Nobody excavates a channel that meanders. A spring flow report. My water right WR11-0842, which the state does not issue on ditches somebody dug. The 2003 agreement calling it a channel and an outfall in the association's own recorded words.

I filed it on the 20th. The hearing on the variance was set for the 24th. And then on May 21, three things landed on the same square of the calendar. The hearing on the 24th, the redbuds, which had another 10 or 12 days in them, and no more, and a storm system out of the southwest that every forecast in the state had started putting a color on, expected arrival the night of the 22nd, 2 days before the hearing.

I called the county at 4 in the afternoon on May 21 and I got Stag's assistant and I said it as plainly as I could. The outfall is still blocked. They raised it 3 ft and armored it Tuesday. There are 4 to 6 inches coming Thursday night.

That pond has no relief. She put me on hold for a while. Miss Stag says the file is with the hearing officer, she said when she came back. It'll be addressed on the 24th.

I stood out at the boundary that evening with my phone in my hand. The pad sat there in the last of the light, 3 ft taller than it had been, gray and hard and perfectly flat, with quarry stone banked down the west side like the wall of a fort. Behind it up the hill, 196 roofs were coming on with their porch lights. The wind changed at about 9 and came around out of the southwest, and it smelled like rain from a long way off.

It started at 10:03 p.m. on May 22. I know the time because I was awake for it. I hadn't really slept since the 18th. I sat in the kitchen with the radar up on the laptop and watched a band of red come across the county line like something being poured.

By 4:40 a.m., we had 4.6 inches. At 3:30 a.m., I called the county emergency line and gave them the same facts for the fourth time. Obstructed permitted outfall. Stonebrier Landing.

No relief on the retention pond, occupied structures below it. The dispatcher took it. I don't blame her for anything. Then I did the only thing I had left, which was call an 81-year-old woman at 3:40 in the morning.

Maud picked up on the first ring. "It's coming," I said. "I know. I've been watching it." I heard a chair scrape.

"What do I do?" "Wake the circle." "Tell them to move their cars up to Bell Hollow and get anything off a basement floor right now. Maud, don't wait for her."

"She'll say I'm causing a panic." "She'll say that either way." The pond topped at 4:52 a.m.

I was standing at my north fence in a rain jacket with a flashlight I couldn't see 20 ft with. And I heard it before I saw anything. The water going over the whole rim of that basin at once. A wide flat roar.

No outlet sound at all because there was no outlet. Then it did the thing I had been afraid of since April. And it was worse than I'd pictured. It didn't come down the hill toward me.

The pad held. It went backward. A retention pond that can't discharge fills its own inlet pipes. Every storm drain in that subdivision runs downhill into that basin.

And once the basin is full, the water comes back up through the pipes into the streets it just left. At 5:20 a.m., the manhole covers on Stonebrier Circle began to move. Birdie described it to me later, and his voice still wasn't right when he did. He said there was a knocking sound under the pavement three or four beats and then a cast iron lid went up out of the road on a column of water and landed in a yard.

News in the same category

HOA President Filled My Creek Without Permission — Then Their Entire Neighborhood Started Flooding

8 Part